UT-HW-2612-103 · UT-CAT-07 FIXED_RFP · Demand Window >4 Weeks

[UT-HW-2612-103] Asia-Pacific & Oceania · IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts (Batch Volume: 20–50 Sets)

Pavilion TrackUT-CAT-07 Digital Grid Condition Sensing & Smart Substation Hardware Pavilion
Procurement ModeFIXED_RFP
Window StatusDemand Window >4 Weeks
Target Macro-RegionAsia-Pacific & Oceania
Estimated Batch Band20–50 Sets
Structured Technical Parameters
  • Scope: IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts
  • Engineering Specs: high-efficiency redundant CRPS & DIN-rail power; IEC 61850 substation protocol & EMC immunity
  • Estimated Batch: 20–50 Sets
  • Required Standards & QA: IEC 61850 / CE / RoHS / REACH / IP67 compliance documentation and factory test reports
Genericized Engineering Specification & QA BaselineScope: IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts. Engineering Specs: high-efficiency redundant CRPS & DIN-rail power; IEC 61850 substation protocol & EMC immunity. Estimated Batch: 20–50 Sets. Required Standards & QA: IEC 61850 / CE / RoHS / REACH / IP67 compliance documentation and factory test reports.
Mandatory International Certifications
IEC 61850CERoHSREACHIP67
Invited Industrial BeltsShanghai Jiading/Pudong · Nanjing/Nantong/Changzhou · Wenzhou/Hangzhou (Zhejiang) · Shenzhen/Zhuhai (Guangdong)
Corporate Capability SubmissionSubmit corporate manufacturing capability & certification docs referencing the Demand ID to U-TRADE GATEWAY LIMITED (info@umaotong.com)
UT-HW-2612-103 · Asia-Pacific & Oceania · 20–50 Sets
Submit Corporate Capability & Certifications (UT-HW-2612-103) → (EN)