UT-HW-2612-096 · UT-CAT-07 FIXED_RFP · Demand Window >4 Weeks

[UT-HW-2612-096] Southeast Asia · IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts (Batch Volume: 50–100 Sets)

Pavilion TrackUT-CAT-07 Digital Grid Condition Sensing & Smart Substation Hardware Pavilion
Procurement ModeFIXED_RFP
Window StatusDemand Window >4 Weeks
Target Macro-RegionSoutheast Asia
Estimated Batch Band50–100 Sets
Structured Technical Parameters
  • Scope: IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts
  • Engineering Specs: high-efficiency redundant CRPS & DIN-rail power; IEC 61850 substation protocol & EMC immunity; uncooled thermal imaging module & IP67 housing
  • Estimated Batch: 50–100 Sets
  • Required Standards & QA: IEC 61850 / CE / RoHS / REACH / IP67 compliance documentation and factory test reports
Genericized Engineering Specification & QA BaselineScope: IEC 61850 Digital Substation Condition Sensors, Grid Switches & Switchgear Parts. Engineering Specs: high-efficiency redundant CRPS & DIN-rail power; IEC 61850 substation protocol & EMC immunity; uncooled thermal imaging module & IP67 housing. Estimated Batch: 50–100 Sets. Required Standards & QA: IEC 61850 / CE / RoHS / REACH / IP67 compliance documentation and factory test reports.
Mandatory International Certifications
IEC 61850CERoHSREACHIP67
Invited Industrial BeltsShanghai Jiading/Pudong · Nanjing/Nantong/Changzhou · Wenzhou/Hangzhou (Zhejiang) · Shenzhen/Zhuhai (Guangdong)
Corporate Capability SubmissionSubmit corporate manufacturing capability & certification docs referencing the Demand ID to U-TRADE GATEWAY LIMITED (info@umaotong.com)
UT-HW-2612-096 · Southeast Asia · 50–100 Sets
Submit Corporate Capability & Certifications (UT-HW-2612-096) → (EN)